The Building Regulations

LCA calculation under the climate requirements in BR18

BR18 requires that many new buildings have their climate impact calculated, and that the calculation stays under a limit value. This page sets out who the requirement covers, which figures apply, and what the calculation contains. The work in the program is described in the guide at guide.lcabyg.dk.

Who has to document climate impact

The date of the application for a building permit decides which version of the climate requirements the building case must follow. An application from 1 July 2025 or later follows the current requirements. An application from 1 January 2023 to 30 June 2025 follows the first version. That is what Social- og Boligstyrelsen writes.

Applications from 1 July 2025

When buildings and extensions are constructed, climate impact must be calculated over the building's life cycle. Buildings and extensions in the same building case can be calculated together. The requirement is in BR18 § 297.

The following are exempt from the calculation requirement:

  • Unheated buildings with a floor area under 50 m², calculated under § 455.
  • Transportable structures under §§ 6 a-6 f.
  • Temporary, movable pavilions under §§ 287-292.
  • Extensions with a heated floor area under 250 m² to farmhouses, detached single-family houses, terraced, linked and semi-detached houses, and holiday homes, camping cabins and similar holiday dwellings.

Extensions to other building types, for example multi-storey housing, offices and institutions, are covered. Conversion and renovation of existing buildings are not covered. According to Social- og Boligstyrelsen, agricultural breeding and operations buildings and greenhouses are not covered by chapter 11 and therefore not by the climate requirements.

The limit value in § 298 applies to construction covered by § 297. Certain uses are exempt from the limit value, but must still be calculated. That covers buildings for commercial industrial production where the production plant is part of the building, buildings for energy production, energy distribution, water supply and waste handling, hospitals, prisons and detention facilities, grandstands at stadiums, and the armed forces' operational buildings. The BBR codes are in § 298, subsections 9 and 10.

Applications from 1 January 2023 to 30 June 2025

In that period, climate impact had to be calculated for new buildings that had to meet the energy frame in § 259 or § 260, except for construction exempted under § 251, subsection 2. Holiday homes and extensions were not covered. The requirement applied to applications from 1 January 2023. The text is in BR18 § 297 and § 298, the version from 1 January to 30 June 2025, and the entry into force is described by Social- og Boligstyrelsen.

The limit value of 12.0 kg CO₂-equivalents per m² per year applied only to new buildings with a heated floor area over 1,000 m². Smaller new buildings that had to meet the energy frame had to be calculated, but had no limit value.

Limit values

Climate impact is stated in kg CO₂-equivalents per m² per year. The reference period is 50 years from the completion notification. The result is rounded to one decimal place before it is assessed whether the requirement is met.

From 1 July 2025

There are two limit values. One covers modules A1-A3, B4, B6 and C3-C4 together and depends on the building type. The other covers the construction process, modules A4 and A5, and is 1.5 kg CO₂-equivalents per m² per year for all types. The figures are in § 298, subsections 1 and 5, and are explained in the Building Regulations guidance.

Limit value for A1-A3, B4, B6 and C3-C4, kg CO₂-equivalents per m² per year. The construction process A4-A5 has an additional 1.5 for all types.
Building typeLimit value
Holiday homes, camping cabins and similar holiday dwellings, heated floor area under 150 m²4.0
Holiday homes, camping cabins and similar holiday dwellings, heated floor area of at least 150 m²6.7
Farmhouses, detached single-family houses, and terraced, linked and semi-detached houses6.7
Multi-storey housing, and offices, retail, warehouses and similar7.5
Other buildings8.0

If the building has several uses with different limit values, the limit value is set as an area-weighted average (§ 298, subsection 4). Extensions must meet the limit value for the extension's use. The part of the energy need that gives a supplement to the energy frame, and an increased climate impact from special conditions, are not included in the comparison with the limit value (§ 298, subsections 7 and 8). How the area and the weighted limit value are entered in LCAbyg is in the guide on reference area and mixed use.

Up to 30 June 2025

The limit value was 12.0 kg CO₂-equivalents per m² per year for new buildings over 1,000 m² heated floor area that had to meet the energy frame. It was calculated for A1-A3, B4, B6, C3 and C4. Module D was not included, and modules A4 and A5 were not part of the calculation. The building owner could state that the building met a voluntary low-emission class of at most 8.0 kg CO₂-equivalents per m² per year. That class is not the same as the limit value of 8.0 for other buildings from 1 July 2025.

Voluntary low-emission class

Under the current rules, the building owner can state that the building meets the low-emission class if the climate impact stays under the figures below, and if the construction process (A4-A5) emits at most 1.1 kg CO₂-equivalents per m² per year. The class is voluntary. It is in § 297, subsections 13 and 15, and it is not the limit value in § 298.

Low-emission class for A1-A3, B4, B6 and C3-C4, kg CO₂-equivalents per m² per year. A4-A5 may in addition be at most 1.1.
Building typeLow-emission class
Holiday homes, camping cabins and similar holiday dwellings, heated floor area under 150 m²3.2
Holiday homes, camping cabins and similar holiday dwellings, heated floor area of at least 150 m²5.4
Farmhouses, detached single-family houses, and terraced, linked and semi-detached houses5.4
Multi-storey housing, and offices, retail, warehouses and similar6.1
Other buildings6.4

Social- og Boligstyrelsen has published indicative targets for tightenings in 2027 and 2029. They are not stated as limit values in the current regulations.

What an LCA calculation covers

The calculation follows DS/EN 15978:2012. Climate impact is calculated for 50 years from the building's completion notification. The current calculation includes these modules (§ 297, subsection 4):

  • A1 raw materials, A2 transport and A3 manufacturing.
  • A4 transport to and from the construction site.
  • A5 construction and installation.
  • B4 replacement. Transport and installation of the replacement are not included.
  • B6 energy use in operation.
  • C3 waste processing and C4 disposal.
  • D potential for reuse, recycling and other recovery.

The limit value for the building is the sum of A1-A3, B4, B6 and C3-C4. Module D is calculated, but it is not part of the limit value. A4 and A5 are kept separate and compared with the limit value for the construction process. In the calculation up to 30 June 2025, A4 and A5 were not included at all, and module D was expressly kept out of the limit value.

Which building parts are included is set out in annex 2, table 6. The area the result is distributed over is calculated under § 297, subsection 5. Replacements in B4 follow the service lives in BUILD REPORT 2021:32, BUILD levetidstabel, version 2021.

Climate impact from materials (A1-A3, C3-C4 and D) is calculated with the generic data in annex 2, table 7. For energy use and transport in A4 and A5, the principles and table values in annex 2, table 10 are used, and for treatment of construction waste in A5, table 11. Instead of tables 7, 10 and 11, you can use data from an environmental product declaration (EPD). The EPD must be relevant and valid and prepared according to DS/EN 15804. It can be project-specific, product-specific, or an average for a product type. There is no requirement that a product has an EPD.

For buildings with an energy frame, operational energy (B6) is calculated from the energy need in §§ 250-256 and the emission factors in annex 2, table 8.1. A valid environmental product declaration for the specific district-heating plant can be used instead, when the plant is approved under the Danish Heat Supply Act. The tables are collected in annex 2.

LCAbyg for the documentation

LCAbyg is a program for life cycle assessment of buildings. It can be used to document the climate requirements in BR18 (2023) and BR18 (2025). You enter building elements, materials and energy use. The program calculates the climate impact and shows it against the limit value for the calculation type the project is set up for.

How § 297 and § 298 are built into the program, and how you check the result, is in the guide. Here on lcabyg.dk you will find the product, the prices and the student licence.

No payment card required

Frequently asked questions

Who has to document climate impact under BR18?

For building cases with an application for a building permit from 1 July 2025, climate impact must be calculated when buildings and extensions are constructed. Exceptions include unheated buildings under 50 m², transportable structures, temporary movable pavilions, and extensions under 250 m² heated floor area to single-family houses, terraced houses and holiday homes. For applications from 1 January 2023 to 30 June 2025, the calculation requirement applied to new buildings that had to meet the energy frame. The application date decides which version applies.

Which limit value applies from 1 July 2025?

The limit value depends on the building type and covers modules A1-A3, B4, B6 and C3-C4, in kg CO₂-equivalents per m² per year. Holiday homes and similar holiday dwellings under 150 m² heated floor area have 4.0. Holiday homes of at least 150 m², and farmhouses, single-family houses and terraced, linked and semi-detached houses, have 6.7. Multi-storey housing, and offices, retail and warehouses, have 7.5. Other buildings have 8.0. The construction process, modules A4 and A5, has its own limit value of 1.5 for all types.

What applied before 1 July 2025?

For applications from 1 January 2023 to 30 June 2025, the limit value was 12.0 kg CO₂-equivalents per m² per year, and only for new buildings with a heated floor area over 1,000 m² that had to meet the energy frame. Smaller new buildings in the same group had to be calculated, but had no limit value. Modules A4 and A5 were not part of that calculation.

Is module D included in the limit value?

No. Module D must be included in the calculation, but it is not part of the limit value. Under the rules from 1 July 2025, the limit value is the sum of A1-A3, B4, B6 and C3-C4, and the construction process A4 and A5 has its own limit value. In the rules up to 30 June 2025 it was stated directly that module D is not included.

Does the calculation have to use EPDs?

No. There is no requirement that the materials have an EPD. Climate impact from materials can be calculated with the generic data in annex 2, table 7 of the Building Regulations. You can instead use a relevant and valid environmental product declaration according to EN 15804. It can be project-specific, product-specific, or an average for a product type.

Can LCAbyg be used for the documentation?

Yes. LCAbyg can be used to document the climate requirements in BR18 (2023) and BR18 (2025). The program calculates the climate impact and shows it against the limit value. How to do it in practice is set out in the guide at guide.lcabyg.dk.